EMWPC successfully guided this project through a complex series of municipal authorizations. These approvals included: subdivision and site plan approval from the Planning Board, State Environmental Quality Review, Architectural Review Board, tree preservation approval and a building permit. As a result, the client was able to subdivide the lot and create an additional lot for development of this new residence.

The site presented a number of challenges, including steep slopes and a location adjacent to the Old Croton Aqueduct State Park. From schematic design through construction documents, EMWPC worked to create a quality design that provided maximum value to the client while working in harmony with the unique site and neighboring community.

The first floor consists of a large kitchen, dining room, breakfast area, family room, guest/maid bedroom, laundry room and 1 ½ baths. The second floor contains three bedrooms, 1 ½ baths and a master bedroom and bathroom suite. Construction was completed in 2005 and the residence sold for over 1.75 million dollars.

 

gallery of project images